Description |
Welcome Program Test & Evaluation Strategy (TES). You will learn that the Test & Evaluation Master Plan (TEMP) includes a Test Strategy that describes the software development testing. The software test strategy includes how automated testing is used within the Continuous Integration/Continuous Delivery/Deployment (CI/CD) pipeline. The DoDI 5000.89 is the basis for the TEMP and Test Strategy. The DoDI 5000.89 includes the use of the Digital Engineering Strategy (DES) and the DevSecOps Strategy to help describe the software test event necessary to test modern software. This micro course is in support of the DevSecOps series of credentials.
|
Objectives
|
Download Course Objectives
|
Target Attendees
|
Members of the Engineering and Technical Management Functional Area who are engaged in software development.
|
Prerequisite(s)
|
None
|
Predecessor Course(s)
|
Predecessor |
Predecessor Course Title |
PDS Code |
Expires On |
None |
None |
None |
None |
|
Course Length
|
Approximately 26 minutes to complete
|
Additional Course Information
|
Delivery Mode |
Online Training
|
Equivalent Courses |
N/A |
Availability |
All
|
PDS Code |
04K |
Walk-ins Authorized |
N/A
|
Pre-work required |
No
|
First Offering |
4/29/2024
|
|
ACE Recommended Credits |
None |
Continuous Education Units |
0 |
Continuous Learning Points |
0 |
Reservist Retirement Points |
0 |
Historical Allocations |
Mouse Over for Past CEU/CLPs
|
Fulfillment Eligible |
N/A
|
Technical Requirements |
Click Here |
|
Notes
|
- Any exams in this course must be passed with a minimum score of 80%.
- There is no time limit for completing this course.
- After completing the course, please be sure to complete the survey at the end.
- Since this course is less than 30 minutes, no CLPs are assigned. To receive CLP credit, students should bundle the completion of this and similar courses together and apply to their supervisor for CLP approval.
|
|